rayburn renovations |
now, remember, this is how we (finally) got it out of the van.
|
|
|
|
|
firstly, remove any slates from the floor, then dig a hole. make up some 'shuttering' for a plinth
|
pour concrete into the shuttering and the hole to make a firm base |
|
|
|
|
|
| remove the top of the rayburn and remove all the fire bricks - replace any broken bricks. | remove all the fire wool and rope, remove the back boiler and replace with fire bricks | |
|
|
![]() |
|
|
errr - re-build and simply pick up the rayburn and put on the plinth .oO( *man* that sounds easy when it's put like that why, then, does my back hurt so much ..!!) oh yes, and design and install the flue ..!!
|
winter 2002 - still awaiting worktops and foot boards - note the 'barbie' oven as backup and for summer use. |